ComEd - Permanent Control Building, E 87th and LSD (Request for Proposal)
Posted
Aug 24, 2026
Oct 23, 2026
Work includes architectural & structural scope includes precast concrete building envelope with insulated panels; pile-supported foundation and reinforced concrete slab; structural steel framing; interior layout including control room and battery room. Mechanical scope includes HVAC systems including AHUs and exhaust fans; hydrogen detection systems in battery room; testing, adjusting, and balancing (TAB) and commissioning. Electrical scope includes equipment connections for HVAC and control systems
