Closing soon

Y1DZ--PCAC EHRM Infrastructure Upgrades Construction - Togus VAMC RFP

Description: This project will include but not limited to the following infrastructure improvements: The architectural demolition, reconfiguration, expansion, and renovation of existing spaces. The architectural construction of new finished spaces, doors, and flooring systems. The structural alteration of existing structural components, and construction of new structural equipment support, Electrical upgrades including electrical panels, normal and critical power distribution, bonding, Uninterrupted Power Supplies (UPS), lighting, and new power outlets. The installation and programming of Building Automation System (BAS) equipment and interfaces, Upgrades to existing HVAC, reprogramming of existing controls, and the installation of new HVAC and new controls. The modification of existing plumbing to avoid Telecommunication Rooms, and the installation of new plumbing to support new mechanical systems, and interior drainage. Upgrades to data communication infrastructure including new data outlets, patch panels, seismic rated IT racks, cable management, in building as necessary. This includes the re-cabling of all existing data cabling within the entire campus to CAT 6A. Upgrade of the fiber infrastructure backbone, campus wide both within buildings and between buildings and all associated civil site construction and landscaping. Civil site work, including the installation of concrete duct banks, installation of new pre-cast manholes, the excavation and repair of existing building waterproofing, and the restoration of site conditions. The abatement of asbestos and lead based paint, including the preparation of an abatement plan in accordance with the requirements of the Maine Department of Environmental Protection. The installation of a radon mitigation system, including the preparation of detailed working drawings that are signed by a radon mitigation contractor registered with the State of Maine. Fire Suppression Upgrades including new gaseous suppression systems, and the modification of existing fire sprinkler systems. New fire sprinkler system for the new MCR Building. Fire Alarm Upgrades. Firestopping and fire caulking for all wall and floor penetrations within the project scope. Physical security upgrades including Physical Access Control, intrusion detection, and security cameras

Buyer
Released
Oct 15, 2026
Closes
Oct 30, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts