Santa Clara Valley Transportation Authority
Special DistrictCA
Posted
Sep 21, 2026
Nov 12, 2026
US 101 Express Lanes Phase 5
Work includes construct a new 2nd express lane to create a dual express lane system.
Description: Trucking, Temporary and Permanent Hydroseed and Erosion Control Measures, QC/QA Testing, Crash Cushion, Crack Monitoring, Vibration Monitoring, Construction Staking, Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Delineators, Portable Radar Speed Feedback Sign, Temporary Barrier System, Portable Changeable Message Sign, SWPPP, Sweeping, ADL Burial Location Report, Treated Wood Waste, Temporary High-Visibility Fence, Clearing & Grubbing, Dust Palliative, Roadway Excavation (Aerially Deposited Lead), Structure Excavation, Structure Backfill, Subgrade Enhancement Geogrid, Crack & Seat, Prime Coat, AC Dike, Geosynthetic Pavement Interlayer, Tack Coat, Cold Plane AC, Spall Repair, Grinding, Soil Nail, CIDH Concrete Pile, Structure Concrete, Structural Concrete, Minor Concrete, Bar Reinforcing Steel, Structure Shotcrete, Sign Structure, Guard Post, Concrete Backfill, Trash Net, Underground, Abandon Culvert, Abandon Sewer, Adjust Inlet, Sand Backfill, Rock Slope Protection, Minor Concrete, Misc. Iron & Steel, Toll Infrastructure, Sanitary Sewer, Sewer Manhole, Prepare and Paint Concrete, Fencing, Pavement Marker, Roadside Signs, Guardrail Systems, Crash Cushion, Concrete Barrier, Striping & Marking, Rumble Strip, Maintain Existing Traffic Management System Elements During Construction, Electrical, and Construction Materials
SpecialDistrict · CA, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Santa Clara Valley Transportation Authority.
Adjacent opportunities open for bidding right now.
Santa Clara Valley Transportation Authority
Special DistrictCA
Posted
Sep 21, 2026
Nov 12, 2026
Work includes construct a new 2nd express lane to create a dual express lane system.
San Bernardino County Transportation Authority
Special DistrictCA
Posted
Sep 23, 2026
Oct 22, 2026
Provide 1,000 EA channelizer post - white; 1,000 EA channelizer post - black.
Metropolitan Transportation Commission
Special DistrictCA
Posted
Jul 20, 2026
Nov 19, 2026
Provide operational staffing, supervision, and management services for both operations centers and will coordinate activities between the two programs.
Maryland Transportation Authority
State AgencyMD
Posted
Oct 10, 2025
Jan 13, 2027
The project includes additions of Ramps MB and MH to the I-95 and I-695 interchange. Ramp MH provides a connection from eastbound I-695 to Northbound (NB) I-95 ETL. Ramp MB provides a connection from westbound I-695 to NB I-95 ETL. Both these ramps merge into one lane before they go through the Toll Gantry on NB I-95 ETL. See outside link.