Higher EducationCO
Posted
Oct 2, 2026
Oct 21, 2026
Description: Colorado Mesa University issued this open solicitation for the project titled CMU 2885 Devil's Kitchen Renovation. The public record identifies a renovation project, but its detailed description and bid documents are restricted on the posting. It was published October 2, 2026, and is due October 21, 2026, at 10:00 a.m. MDT.
HigherEducation · CO, US
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from Colorado Mesa University.
Adjacent opportunities open for bidding right now.
Higher EducationCO
Posted
Oct 2, 2026
Oct 21, 2026
Colorado Mesa University issued this open solicitation for the project titled CMU 2885 Devil's Kitchen Renovation. The public record identifies a renovation project, but its detailed description and bid documents are restricted on the posting. It was published October 2, 2026, and is due October 21, 2026, at 10:00 a.m. MDT.
Posted
Oct 7, 2026
Oct 30, 2026
Work include kitchen renovation.
School DistrictAL
Posted
Oct 5, 2026
Oct 22, 2026
Selective demolition and renovation of existing kitchen including new equipment, hood, serving line, and cooler/freezer.
Higher EducationMN
Posted
Sep 25, 2026
Oct 15, 2026
Project consists of an interior remodel of an existing instruction plastics lab into a modern instructional robotics lab and classroom. The project includes approximately 6,600 gross square feet located on the first floor at technical college's. The work will include, but is not limited to: minor demolition work includes selective demolition of partial walls, a paint booth and supporting ductwork, cooling, and sprinkler piping, replacement of an existing sink with a multi-station wash fountain, as well as light fixture relocation, cabling removal, panel and device removal. Minor construction work includes partial walls and a ‘lid’ to create a larger sound isolated instructional classroom space with acoustically treated walls and ceiling, interior doors, interior windows, frames, hardware, wire mesh partitions, and finishes. HVAC support for the classroom, infill of an existing trench drain, sprinkler piping modifications and additions, and electrical power, lighting, and device layout modifications to support the revised layout and function of the lab and classroom spaces. Refer to the construction drawings for full extents of demolition, relocation, and new work.