Posted
Oct 6, 2026
Nov 4, 2026
INVITATION TO BIDDERS: New Diesel & HVAC Addition project
Bids for General, HVAC, Plumbing, and Electrical work for the New Diesel & HVAC Addition project.
Description: Perform the replacement of the existing electrical distribution system serving the central exhibit hall.
SpecialDistrict · NV, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalThese related opportunities are still open for bidding.
Posted
Oct 6, 2026
Nov 4, 2026
Bids for General, HVAC, Plumbing, and Electrical work for the New Diesel & HVAC Addition project.
CityWA
Posted
Oct 8, 2026
Nov 3, 2026
Renovations to the existing Covington Aquatic Center facility located at 18230 SE 240th St., Covington WA 98042. The work includes all equipment, labor and materials associated with the site improvements as shown in the Contract Drawings, including replacement of the pool liner, tiles, refurbishing of the bulkhead, repairs to concrete steps, and conversion of two restrooms into restroom/changing rooms ("Work"). Alternate 1 - replace all tile above water line.
CityOK
Posted
Sep 29, 2026
Nov 17, 2026
Pavement milling, overlay, and full depth patching for Dallas Street Rehabilitation, including 1,300 tons of asphalt and 8,000 SY of asphalt pavement milling, plus supporting storm drainage and sidewalk work.
Springfield Fire and Life Safety
Fire DepartmentOR
Posted
Oct 5, 2026
Oct 27, 2026
Repair and restore deteriorated concrete at the south entrance stairs and associated concrete areas at city hall. The work includes concrete repair and a protective two-part epoxy coating system as one complete project. Work generally includes securing and protecting the project site; removing loose, damaged, deteriorated, delaminated, or otherwise unsound concrete within the limits of work; preparing existing concrete surfaces; structurally patching and restoring damaged concrete; and, following completion and adequate curing of the repairs, applying the two-part epoxy coating system to the designated concrete surfaces. The Work also includes maintaining safe pedestrian access, protecting adjacent improvements, cleanup and disposal, coordination with City Hall operations, and all other work.
Decision makers connected to this RFP from Las Vegas Convention & Visitors Authority.